Completed
Solar Water Pump Replacement
Ndanai
About the Project: The Ndanai Borehole rehabilitation included the retrieval of the old pump, drawing pips and drop power cable. It also included the removal of the old solar panels and pump controller, and then the laying of new ones.
About the Site: The money for this project was raised in part with the community, who raised 200,000 KES, or about $2,200 CAD.
Cost: $7,500
Major Donors: George Ford
Partner Donors: TBD
Location: Ndanai, Kenya
Project Manager: Eric Rajah (Canada), Lawrence Mathea (Kenya)
Also At This Site