About the Project

With a student population of more than 1560 that grows by the week, Murindu Primary can never get enough toilets. A few toilets were built recently – six doors for girls and 5 doors plus a urinal for boys – with about as many older pit latrines that are almost full and soon to be condemned. Adding 12 new toilets with septic tanks will respond to the immediate need and provide longer-lasting toilets that can be pumped out. A small water catchment system will also increase the frequency of handwashing.

Photos

Doors have been installed and are just about ready for use.

The paint is coming along and gutters are being installed. 

The walls have quickly gone up.

Digging out the area for the new toilets

Older boys’ toilets.

New toilets were built recently, but still are not enough.

These toilets serve more than 700 girls.

Quick Facts

Cost: $27,000
Location: Nakuru County, Kenya
Start Date: November 2024
Project Manager: Lawrence Mathea